|
Bedford Co. Utility District
P.O. Box 2755
214 Bethany Lane
Shelbyville, TN 37162
931-684-1667
|
Water Department Rates:
Water Rates:
|
RESIDENTIAL: |
|
3/4 to 2
Inch Meter |
|
|
|
|
First 1,500
Gallons |
$14.00
Minimum |
|
|
1,500
- 10,000 Gallons |
$5.75 Per
1,000 Gallons |
|
|
10,000 -
20,000
Gallons |
$6.00 Per
1,000 Gallons |
|
|
All Over
20,000 Gallons |
$6.50 Per
1,000 Gallons |
|
AGRICULTURAL &
COMMERCIAL: |
|
3/4 to 2
Inch Meter |
|
|
|
|
First 2,000
Gallons |
$14.00
Minimum |
|
|
All Over
2,000 Gallons |
$5.50 Per
1,000 Gallons |
|
3 Inch
Meter |
|
|
|
|
First
25,000 Gallons |
$140.50
Minimum |
|
|
All Over
25,000 Gallons |
$5.50 Per
1,000 Gallons |
|
4 Inch
Meter |
|
|
|
|
First
50,000 Gallons |
$278.00
Minimum |
|
|
All Over
50,000 Gallons |
$5.50 Per
1,000 Gallons |
|
6 Inch
Meter |
|
|
|
|
First
62,500 Gallons |
$346.75
Minimum |
|
|
All Over
62,500 Gallons |
$5.50 Per
1,000 Gallons |
|
8 Inch
Meter |
|
|
|
|
First
75,000 Gallons |
$410.50
Minimum |
|
|
All Over
75,000 Gallons |
$5.50 Per
1,000 Gallons |
|
12 Inch
Meter |
|
|
|
|
First
100,000 Gallons |
$553.00
Minimum |
|
|
All Over
100,000 Gallons |
$5.50 Per
1,000 Gallons |
Note: To qualify for the Agriculture and Commercial rates, the
water must be metered through a water meter without any residential
service (i.e. house, horse trailer, travel trailer, or apartment)
attached to meter.
Water Tap Fees:
|
3/4 Inch |
|
$1,500.00 |
|
1 Inch |
|
$2,500.00 |
|
2 Inch |
|
$3,500.00 |
|
4 to 12 Inch |
|
See Policy J - Industrial and
Commercial Customers |
Note: The cost of upgrading from one tap size to another will be the
difference in cost of the respective taps as stated above. (i.e. Upgrade
from a 3/4 inch tap to a 2 inch tap will be an additional $2,000.00)
Churches and community clubs will be charged the actual cost of
installation of the tap in lieu of the full tap fee. This is a community
service provided by the District.
Should the cost of the installation of the tap exceed the tap fee, the
additional cost will be borne by the customer.
System Development Charges:
|
3/4 inch - $1,000.00 |
|
1 inch - $1,300.00 |
|
2 inch - $2,600.00 |
|
3 inch - $4,000.00 |
|
4 inch - $5,300.00 |
|
6 inch - $8,000.00 |
|
8 inch - $10,600.00 |
|
10 inch - $13,300.00 |
|
12 inch - $16,000.00 |
Other Fees:
|
Non-Refundable Service Fee |
|
$50.00 Per Connection |
|
Service Call Fee |
|
$35.00 Per Service Call |
|
Returned Check Service Fee |
|
$30.00 Per Returned Check |
|
Reconnection Fee |
|
$35.00 Per Reconnect |
|
Cut Lock Fee |
|
$35.00 Per Cut Lock |
|
Tampering Fee (Water Theft) |
|
$250.00 Per Occurrence |
|
Tap Removal Fee |
|
$250.00 Per Tap |
|
Hydraulic Analysis Fee |
|
$300.00 Per Analysis |
|
Repossessed Water Tap Fee |
|
$250.00 Per Water Tap |
|
Late Payment Fee |
|
11% of Water Service |
|