Rate Information

 

Rules & Regulations

 

Consumer Confidence Report

 

Leaks

 

Procedures for Taps

 

History

 

Statistics

 

Contact Us

 

Home

 

Bedford Co. Utility District

P.O. Box 2755

214 Bethany Lane

Shelbyville, TN 37162

931-684-1667

 

 

Water Department Rates:

 

Water Rates:

 

RESIDENTIAL:

3/4 to 2 Inch Meter

 

 

 

First 1,500 Gallons

$14.00 Minimum

 

1,500 - 10,000 Gallons

$5.75 Per 1,000 Gallons

 

10,000 - 20,000 Gallons

$6.00 Per 1,000 Gallons

 

All Over 20,000 Gallons

$6.50 Per 1,000 Gallons

AGRICULTURAL & COMMERCIAL:

3/4 to 2 Inch Meter

 

 

 

First 2,000 Gallons

$14.00 Minimum

 

All Over 2,000 Gallons

$5.50 Per 1,000 Gallons

3 Inch Meter

 

 

 

First 25,000 Gallons

$140.50 Minimum

 

All Over 25,000 Gallons

$5.50 Per 1,000 Gallons

4 Inch Meter

 

 

 

First 50,000 Gallons

$278.00 Minimum

 

All Over 50,000 Gallons

$5.50 Per 1,000 Gallons

6 Inch Meter

 

 

 

First 62,500 Gallons

$346.75 Minimum

 

All Over 62,500 Gallons

$5.50 Per 1,000 Gallons

8 Inch Meter

 

 

 

First 75,000 Gallons

$410.50 Minimum

 

All Over 75,000 Gallons

$5.50 Per 1,000 Gallons

12 Inch Meter

 

 

 

First 100,000 Gallons

$553.00 Minimum

 

All Over 100,000 Gallons

$5.50 Per 1,000 Gallons

 

Note: To qualify for the Agriculture and Commercial rates, the water must be metered through a water meter without any residential service (i.e. house, horse trailer, travel trailer, or apartment) attached to meter.

 

Water Tap Fees:

 

3/4 Inch

$1,500.00

1 Inch

$2,500.00

2 Inch

$3,500.00

4 to 12 Inch

See Policy J - Industrial and Commercial Customers

 

Note: The cost of upgrading from one tap size to another will be the difference in cost of the respective taps as stated above. (i.e. Upgrade from a 3/4 inch tap to a 2 inch tap will be an additional $2,000.00)

 

Churches and community clubs will be charged the actual cost of installation of the tap in lieu of the full tap fee. This is a community service provided by the District.

 

Should the cost of the installation of the tap exceed the tap fee, the additional cost will be borne by the customer.

 

System Development Charges:

 

3/4 inch - $1,000.00

1 inch - $1,300.00

2 inch - $2,600.00

3 inch - $4,000.00

4 inch - $5,300.00

6 inch - $8,000.00

8 inch - $10,600.00

10 inch - $13,300.00

12 inch - $16,000.00

 

Other Fees:

 

Non-Refundable Service Fee

$50.00 Per Connection

Service Call Fee

$35.00 Per Service Call

Returned Check Service Fee

$30.00 Per Returned Check

Reconnection Fee

$35.00 Per Reconnect

Cut Lock Fee

$35.00 Per Cut Lock

Tampering Fee (Water Theft)

$250.00 Per Occurrence

Tap Removal Fee

$250.00 Per Tap

Hydraulic Analysis Fee

$300.00 Per Analysis

Repossessed Water Tap Fee

$250.00 Per Water Tap

Late Payment Fee

11% of Water Service

 

Copyright © 2008 Bedford County Utility District

Site Design by On Site Technology